Post-weld heat treatment
PWHT. Precision in every degree.
Controlled heating, monitoring and traceability. Explore electric and gas-fired solutions.
01/ 03
TERANING S.A.S.CARTAGENA, COLOMBIA
TERANING / APPLIED ENGINEERING
Engineering that connects industries.
We maintain, repair and commission the systems that make your operation possible. From Cartagena, Colombia.
About22+
years of technical experience
06
Service lines
09
Connected industries
10°23′N 75°30′WCartagena.
Colombia → the world
Services
View all servicesExpertise to go further.
Explore our capabilities06 / Service lines

Assembly · repair · commissioning
Specialized mechanics
Explore service
Piping · steel · structures
Metalwork and welding
Explore service
Power · control · instrumentation
Electrical and electronics
Explore service
Equipment · spares · materials
Supply and logistics
Explore service
Featured expertiseThermal control · traceability · reliability
PWHT heat treatment
Explore service
Inspection · detection · integrity
Non-Destructive Testing NDT
Explore serviceIndustries
Your industry. Our starting point.
Select an industry and explore solutions for your environment.

FEATURED EXPERTISEPWHT
Precision is also measured in degrees.
Post-weld heat treatment. Controlled heating, monitoring and traceability.
Electrical heatingGas combustion
View serviceIllustrative cycle · Preparation
PRECISION IN EVERY INTERVENTIONFrom challenge to commissioning.
01
Planning
02
Technical execution
03
ExploreTesting and handover
Certifications
Commitment, backed by standards.
BUREAU VERITASCertificationRef. CO21.07654
ISO 9001:2015
ISO 14001:2015
Environmental management
ISO 45001:2018
Occupational health & safety
BLOG
ExploreKnowledge that adds value.
BLOG / TERANING 2 MIN

01 / READING GUIDE
PWHT: what to check before treating a weld
Heating alone is not enough. Material, procedure and thermal records are the starting point for a well-prepared technical discussion.
Read article
BLOG / TERANING 2 MIN

02 / READING GUIDE
Before shutting down equipment: five decisions to settle
A maintenance planning guide: from the initial symptom to spare parts and a documented handover.
Read article
BLOG / TERANING 2 MIN

03 / READING GUIDE
Which test does your equipment need? Start with the question
Surface condition, thickness or internal discontinuities: what to clarify before requesting NDT.
Read article

Cartagena de Indias, Colombia
Request advice



















